A construction draw request is a contractor asking to be paid for work already in place, and the lender's cash follows it. That makes the schedule of values the target: percent complete gets nudged, stored materials get invented, retainage is quietly reduced. The standard AIA G702 and G703 layout is rigid and closed, so every edit has to be carried through a chain of totals, and the places where the chain was not carried through are how the document is caught.

Last updated:

Most edited
  • work completed this period
  • percent complete and balance to finish
  • retainage
  • architect certification
Reviewed by
Construction lenders, owners, architects, and draw inspectors

Where forgers attack a construction draw request

  1. Percent complete inflation

    Work completed this period is raised on lines that are behind, pulling cash forward. The line still foots if percent and balance are rewritten, but the summary total and the architect's certified amount then disagree.

  2. Phantom stored materials

    Materials presumed to be on site are added to a line to raise the amount due without any work in place. The lines reconcile perfectly, so the signal is the edit itself: figures typed into a finished sheet.

  3. Retainage reduction

    The retainage held back is lowered or dropped, increasing the net payment. Retainage that differs from the rate in the contract is visible against the earlier applications in the same file.

  4. Signature and certification transplant

    An architect's or notary's block from an earlier, approved application is lifted onto a new one. The transplanted region keeps the resolution and tone of its source and often sits slightly off the form's alignment.

Questions people ask about a construction draw request

How do lenders check a contractor's draw request?

By reconciling the continuation sheet, summary, and prior application before anything else, then inspecting the site. The paper checks are arithmetic: completed totals, percentages, retainage, and previous certificates carried forward. A forensic review adds whether any number on the form was typed after the form was generated.

What is edited on a construction pay application?

Most often the percent complete and the work completed this period, then the totals that depend on them. Stored materials and retainage are the next favourites. Less often the certification and notary blocks are replaced with ones from a previous approved application.

What is the difference between a G702 and a G703?

The G702 is the one-page summary of the contract sum and payment due. The G703 is the continuation sheet listing each line of the schedule of values. The summary's figures should be the sums of the G703 columns, which makes the pair a self-checking document.

Can TamperCheck tell whether a draw request was altered after it was signed?

It tests whether the printed figures and the signature block belong to the same document generation. Numbers set after the fact tend to differ in font metrics, spacing, and compression from their surroundings, and TamperCheck reports the specific fields and regions concerned.

Where does a forensic review of a construction draw request start?

On a construction draw request, the review prioritises the line arithmetic on the G703 continuation sheet, change-order totals, and the architect's or inspector's certification. After those, the checks that run on every document cover the rest of a construction draw request.

What inconsistency should I check first on a construction draw request?

Usually a disagreement between the G703 line totals and the totals on the G702 summary. On a construction draw request both come from one production pass, so an edit that touches one and not the other shows.

What should a lender check first on a construction draw request?

Start with work completed this period and percent complete and balance to finish, and reconcile them with the rest of the loan file. Then examine the file of a construction draw request itself: edits to those figures leave font, alignment and compression differences that a recalculated total cannot hide.

Where does fraud show up in a construction draw request?

In the figures that decide a transaction: work completed this period, percent complete and balance to finish, and retainage. The layout is genuine or well copied, so the edit sits in one line that the rest of a construction draw request is meant to support.

Is it illegal to alter a construction draw request?

In most jurisdictions, yes: changing work completed this period on a construction draw request and submitting it to get a loan, job, visa or service is treated as forgery or fraud. Penalties vary by country. This is general information and not legal advice.

Anatomy of a genuine construction draw request

The summary sheet states the original contract sum, net change orders, contract sum to date, total completed and stored, retainage, total earned less retainage, previous certificates, and current payment due. Behind it the continuation sheet lists every line of the schedule of values with its scheduled value, work completed in prior periods and this period, materials stored, percent complete, balance to finish, and retainage.

The two sheets have to agree. Each line's completed total is prior work plus this period plus stored materials, percent complete is that total over the scheduled value, and the sums of the columns feed the summary. Previous certificates should equal what the last application certified. A contractor's signature with a notary acknowledgement and the architect's certified amount close the form, so both are checked for consistency with the sheet above them.

Visible warning signs in a construction draw request

  • A work completed this period that breaks the chronology

    Lay the work completed this period against every other date on the document and against when the file says it was created. Backdated and extended dates tend to land in an order no real issuing system would have produced.

  • Percent complete and balance to finish that do not sit with the figures around it

    Work through every number the page lets you recompute. The percent complete and balance to finish are the value a forger most wants to change, and the one a careless edit leaves out of step with the totals and running figures derived from it.

  • Figures that differ between two documents for one loan

    Compare a statement with the sanction letter or schedule for the same facility. Forgers usually edit the document they were asked to produce and not its siblings.

  • A lender name or branch that does not match the facility

    Check the lender, branch and loan reference against how the same lender formats them elsewhere.

  • Payoff or closure dates that precede the last payment

    Look for a closure or payoff that predates the final instalment, or amounts that ignore interest accrued.

How to check a construction draw request step by step

  1. 1. Check the fields against each other

    Read work completed this period, percent complete and balance to finish, and retainage together rather than one at a time. Forgers typically change one value and leave the rest of the document describing the original.

  2. 2. Inspect the file metadata

    Open the document properties and look at the producer, creation date, and modification date. A document produced by a consumer PDF editor, or created long after the date printed on its face, is worth a closer look.

  3. 3. Ask for a second document

    Request a corroborating document from the same issuer or an adjacent period. Forgery effort concentrates on one file, so inconsistencies surface as soon as there are two to compare.

  4. 4. Run a forensic check

    Manual review catches obvious edits but not field-level pixel manipulation or synthetic generation. TamperCheck runs 300+ forensic checks on a construction draw request and returns a risk score from 0 to 100 within seconds, on published per-document pricing.

The forensic checks that matter most for a construction draw request

  • Date and validity consistency

    Issue, expiry, and period dates are checked against one another and against the file's own creation metadata, which catches backdating and validity extension.

  • Arithmetic reconciliation

    Stated totals are recomputed from their components, and running or cumulative figures are checked for continuity across periods. A single edited value breaks the chain even when the page still looks right.

  • Table structure integrity

    Inserted and deleted rows leave structural artifacts behind: inconsistent spacing, misaligned columns, and formatting the visible table no longer accounts for.

  • And many more checks

    The three above are the layers that carry the most weight on a construction draw request. Every upload runs the full suite of 300+ checks regardless of document class, spanning file structure and metadata, pixel-level forensics, font and text rendering, optical and print characteristics, provenance signals, AI-generation signatures, and many more checks.

Check a document

Upload a PDF or a photo of construction draw request. TamperCheck returns a risk score from 0 to 100 and marks the region that was edited, usually within seconds.

For developers, the API class is construction_draw_request. See the API and MCP documentation.